M | T | W | T | F | S | S |
---|---|---|---|---|---|---|
23 | 24 | 25 | 26 | 27 | 28 | 1 |
2 | 3 | 4 | 5 | 6 | 7 | 8 |
9 | 10 | 11 | 12 | 13 | 14 | 15 |
16 | 17 | 18 | 19 | 20 | 21 | 22 |
23 | 24 | 25 | 26 | 27 | 28 | 29 |
30 | 31 | 1 | 2 | 3 | 4 | 5 |
A 512 "test" run was carried out on marenostrum in order to prepare the huge run that we all hope to make shortly.
This run had dark-matter, hydro, cooling and star formation (done like in Y. Rasera thesis).
The grid was 512³ with 5 refinement levels and the box length was 50 Mpc/h. The last snap-shot was at z=0.4 (?)
The last snap-shot is available on Horizon2